Work begins on Rathcoffey Road pitch development 2001 |
Top soil is stripped back to get the levels |
Drainage is installed |
Following a 250,000 development 4 new playing surfaces begin to mature. |
|
Pitchside Advertising around the main pitch assists the development of Rathcoffey Rd facility |
| |
Revised Clubhouse Plans due to go to Tender in March 2007 |
| |
Ground works begin in Aug 2007 for the new clubhouse |
| |
Sub-floor and under ground heating installed |
| |
Floor finish and sewerage installed |
Blockwork commences and outer path takes shape |
| |
Inner walls taking shape |
Outer walls and insulation installed |
![]() |
Block work is complete to roof level |
| |
Roofing complete |
Breaking New Ground - Building for the Future